Shooting Schedule
Draft 1:
Date 18 February
Time 4:00 PM – 9:00 PM
Location Askari 14 (residential area)
People: Me, 2 team members, 2 cast members
Outcome: First full draft completed
Issues Faced: Problems with the quality and time of the video, turned out to be too short.
Draft 2
Date 27 March
Time 6:30 PM – 10:30 PM
Location Askari 14
People: Same team and cast members
Changes: Made Script changes, added a lot new scenes, a monologue and reshooting of some old scenes.
Reason: Improvements needed from Draft 1 and a longer video.
Focus: Better shots and improved overall quality and new scenes.
IN WRITTEN WORDS
DRAFT 1.
In our first draft, we believed that we had completed the full opening. It was filmed on 18 February between 4pm and 9pm. The location was Askari 14, which is a residential area suitable for our scenes. The people involved included me, my two team members, and our two cast members. However, after reviewing the footage, we realized that there were some issues in terms of quality and execution, errors like shaky videos and bad framing, as well as the length of the video being too small.
DRAFT 2:
For our second draft, we made several changes to improve our work. There were some mistakes in the first version and we also made changes to the script, so we had to reshoot certain scenes. This was filmed on 27 March. Due to Ramadan, the shooting took place later in the day, from 6 30 pm to 10:30pm. The location remained Askari 14, and the same crew and cast members were involved. This time, we focused on improving our shots and overall quality. However, the video ended up being 3 minutes long which was against the requirements hence at the end time we changed it to 2 minutes 25 seconds, although we were recommended to go lower by our teacher but reducing further would've made the film lose context.


Comments
Post a Comment